SRR No. 1505-02 Lay-On Gable Frame Connection: An Analysis of a Toe Nail Connection Visible After Sheathing is Installed
A lay-on gable frame is typically connected from the top during truss placement, but after sheathing is installed, this connection is no longer visible for the building inspector to verify. This creates a need for an alternate connection that is visible from below. The goal of this report is to analyze a simple, cost-effective, toe nail connection between the lay-on gable frames and supporting truss system that is visible after sheathing is installed. 
This legacy SBCA Research Report represents information and code requirements current as of the publication date shown. However, codes and standards change periodically. The user is encouraged to verify the referenced information is still current and conforms to current code requirements.