What is the industry standard for ordering residential roof truss systems: Should the general contractor/builder field measure before ordering trusses or should he rely on the blueprint? Who is responsible for their accuracy – the plan service, the truss manufacturer, the builder/general contractor or the framing contractor?
This document is effective until December 31, 2025. After that date, this dated version of the document should not be relied upon.
Feeling inspired? Share these insights on social.